Control panel and cabinet wiring, quoted within an hour.
Wiring fitted into the enclosure, to your layout and your schematic: DIN rail, duct, terminal blocks, marked wire and documented torque. Send an EPLAN export or a set of drawings and a fixed price comes back.
All uploads are secure & protected by NDA.
1h
Quote turnaround on a complete spec
5days
Production lead times from 5 days
50+
Carefully vetted manufacturing sites across the globe
IPC/WHMA-A-620
Class 2/3 on request
Three steps from drawing to delivery.
You upload a spec and approve a price. We'll take care of the rest.
Upload your spec & get a quote
A drawing, BOM, wire schedule, EPLAN export — a photo of the harness you're replacing, or just a description of the build. A fixed price comes back within an hour.
Review & confirm your quote
We make it production-ready before anything is built: connectors, wire gauges, strip lengths and tolerances normalised into a manufacturable spec, with anything missing flagged to you.
Built & delivered
Production from 5 days, 100% continuity-tested, with test records. If your spec calls for IPC/WHMA-A-620 Class 2 or 3, we build and document to it. We ship worldwide, including Europe, the UK, the USA, Australia and Southeast Asia.
Quote a control panel build within an hour.
An EPLAN or Zuken export, a schematic with a layout drawing, or photographs of the panel you are repeating. Tell us who supplies the enclosure and the components and the rest can follow.
- Uploads are encrypted and NDA-protected
- If anything's missing, we'll ask — not guess
- Once you approve, we'll place your order with a vetted manufacturer from our network
What our customers say
Everything went as expected, much appreciated. We will keep using your wire harness services in the future.
Capacity where your order needs it.
Every order goes to the partner best placed to build it — chosen for the processes your drawing needs, the certification it has to carry, and the lead time you are working to. Every manufacturing partner was carefully vetted before taking on work.
Region is a filter on an order, not a fixed answer. If your project has to be built in a particular country or economic area, say so on the enquiry and we will confirm at quote time whether we can place it there.
Where our panel builds go to work.
Every sector below has its own qualification requirements. We match your project to a manufacturer that already builds to them.
Industrial machinery
Machine control cabinets, wired to schematic.
Energy & power
Switchgear and power-distribution panels.
HVAC & building systems
Control panels for HVAC equipment.
Robotics & automation
Robot cell and automation control panels.
- Another sector?If it is built from wire and connectors, send the drawing.Get My Quote
Every layout, termination and record we can quote for a panel.
Capabilities across our partner network for cabinet work. Your project is matched to a manufacturer already building panels to the standards your schematic names.
Assembly
- DIN rail layout and component mounting to your arrangement drawing
- Wiring duct cut, fitted and filled to a stated fill ratio
- Terminal blocks, jumpers, end stops and marker carriers fitted
- Ferruled wire ends crimped to the standard your schematic names, 0.25–35 mm²
- Wire marking and labelling to your schematic's wire numbers
- Torque-controlled fastening on terminals, studs and bar joints
- Door wiring, hinge loops, glands and cable entries
Components
- Phoenix Contact, Weidmüller, Wago, Rittal and Schneider families
- Enclosures free-issued by you, or sourced to your part number
- H05V-K / H07V-K panel wire, halogen-free where specified
- Duct, DIN rail, end covers, markers and marker carriers
- Obsolescence checks and drop-in alternates at quote time
Test & documentation
- 100% continuity testing against your schematic, wire number by wire number
- Torque documentation where the drawing specifies it
- Insulation resistance and dielectric withstand where specified
- As-built drawing mark-ups where your order calls for them
- Lot traceability on wire, terminals and marked components
- First-article inspection reports and certificates on request
If your spec calls for IPC/WHMA-A-620 Class 2 or 3, the order goes to a partner certified to it. That partner's certificates come with the order.
Panel standards and approval marks are held by individual manufacturers rather than by the network as a whole. Name the one your panel is built to on the enquiry and we confirm at quote time who can meet it.
Questions engineers & buyers ask.
Either. Free-issue the enclosure and the parts and we quote the build alone; or give us the part numbers and they are sourced and priced in with it. Say which on the enquiry, because it is the largest single variable in the price.
A schematic and a layout drawing, or an EPLAN or Zuken E3 export that carries both. Where a panel is being repeated, photographs of the original with the terminal strips legible get us a long way.
Continuity is checked against the schematic, wire number by wire number. Insulation resistance, dielectric withstand and workmanship inspection to a named class are added where your order specifies them.
Where the drawing specifies it, yes — terminals, studs and bar joints are fastened with controlled torque and the records come with the panel.
Name it on the enquiry. Panel standards and approval marks are held by individual manufacturers, not by the network as a whole, so we confirm at quote time which partner can build to the one your project needs.
One is fine. Single panels, repeat builds and series are quoted through the same intake, and there is no minimum.
Ready to quote your panel build?
- Quote
- 1h
- Production
- From5days
- Minimum
- None
Not ready to create a quote yet?
Create a free account now and send your drawings & specifications for a quote when you're ready.